NSWGR pre 1980 in HO scale
A journey back with a twist.
Saturday, 9 November 2013
The rails are off the floor and on two tables bolted with a channel joiner.
The track is down and power is on but there is a lot to go before the layout is complete...
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment